Tanzania Tanzania: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Tanzania contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Tanzania

Tanzania is #47 in the world.

Compare Tanzania with another country

Tanzania Tanzania
A maximum of 4 countries can be selected!
Selected countries


More data for Tanzania

In our database there are 24,015 data sets for Tanzania. Here is a selection of some more data for Tanzania.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 99,000
Electricity exports (kWh) 0
Electricity imports (kWh) 50,000,000
Access to electricity (% of population) 32.8
Electricity production from oil, gas and coal sources (% of total) 57.7
Electric power transmission and distribution losses (% of output) 17.7
selected data set
Time required to get electricity (days)
109.0
Delay in obtaining an electrical connection (days) 52.6
Capacity of power plants, total (megawatt) 1,387
Capacity of power plants, public (megawatt) 1,356
Capacity of power plants, self-producer (megawatt) 32

General data

Data set Value
Population, total 59,091,392
Area (sq. km) 947,300.0
Gross domestic product in exchange rates (US $) 52,090,320,325
Gross domestic product per capita (US $) 936