South Africa South Africa: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for South Africa contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for South Africa

South Africa is #82 in the world.

Compare South Africa with another country

South Africa South Africa
A maximum of 4 countries can be selected!
Selected countries


More data for South Africa

In our database there are 25,293 data sets for South Africa. Here is a selection of some more data for South Africa.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 4,198,000
Electricity exports (kWh) 15,040,000,000
Electricity imports (kWh) 11,890,000,000
Access to electricity (% of population) 84.2
Electricity production from oil, gas and coal sources (% of total) 93.1
Electric power transmission and distribution losses (% of output) 8.4
selected data set
Time required to get electricity (days)
84.0
Delay in obtaining an electrical connection (days) 15.8
Capacity of power plants, total (megawatt) 48,094
Capacity of power plants, public (megawatt) 41,014
Capacity of power plants, self-producer (megawatt) 7,080

General data

Data set Value
Population, total 57,398,421
Area (sq. km) 1,219,090.0
Gross domestic product in exchange rates (US $) 349,419,343,614
Gross domestic product per capita (US $) 6,161