Senegal Senegal: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Senegal contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Senegal

Senegal is #97 in the world.

Compare Senegal with another country

Senegal Senegal
A maximum of 4 countries can be selected!
Selected countries


More data for Senegal

In our database there are 21,729 data sets for Senegal. Here is a selection of some more data for Senegal.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 223,000
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 64.5
Electricity production from oil, gas and coal sources (% of total) 87.8
Electric power transmission and distribution losses (% of output) 12.8
selected data set
Time required to get electricity (days)
75.0
Delay in obtaining an electrical connection (days) 24.8
Capacity of power plants, total (megawatt) 892
Capacity of power plants, public (megawatt) 510
Capacity of power plants, self-producer (megawatt) 382

General data

Data set Value
Population, total 16,294,270
Area (sq. km) 196,710.0
Gross domestic product in exchange rates (US $) 16,374,743,753
Gross domestic product per capita (US $) 1,033