Samoa Samoa: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Samoa contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Samoa

Samoa is #167 in the world.

Compare Samoa with another country

Samoa Samoa
A maximum of 4 countries can be selected!
Selected countries


More data for Samoa

In our database there are 14,981 data sets for Samoa. Here is a selection of some more data for Samoa.

Electricity Daten

Data set Value
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 100.0
selected data set
Time required to get electricity (days)
34.0
Delay in obtaining an electrical connection (days) 9.8
Capacity of power plants, total (megawatt) 45
Capacity of power plants, public (megawatt) 43
Capacity of power plants, self-producer (megawatt) 3

General data

Data set Value
Population, total 197,695
Area (sq. km) 2,840.0
Gross domestic product in exchange rates (US $) 856,626,506
Gross domestic product per capita (US $) 4,361
We use Cookies, by using this website or closing the menu you accept the usage of cookies. OK