São Tomé and Príncipe São Tomé and Príncipe: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for São Tomé and Príncipe contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for São Tomé and Príncipe

São Tomé and Príncipe is #73 in the world.

Compare São Tomé and Príncipe with another country

São Tomé and Príncipe São Tomé and Príncipe
A maximum of 4 countries can be selected!
Selected countries


More data for São Tomé and Príncipe

In our database there are 12,005 data sets for São Tomé and Príncipe. Here is a selection of some more data for São Tomé and Príncipe.

Electricity Daten

Data set Value
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 65.4
selected data set
Time required to get electricity (days)
89.0
Capacity of power plants, total (megawatt) 26
Capacity of power plants, public (megawatt) 26
Capacity of power plants, self-producer (megawatt) 1

General data

Data set Value
Population, total 208,818
Area (sq. km) 960.0
Gross domestic product in exchange rates (US $) 390,871,569
Gross domestic product per capita (US $) 1,913
We use Cookies, by using this website or closing the menu you accept the usage of cookies. OK