The data set "Time required to get electricity (days)" for Rwanda contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Rwanda

Rwanda is #167 in the world.

Compare Rwanda with another country

Rwanda Rwanda
A maximum of 4 countries can be selected!
Selected countries


More data for Rwanda

In our database there are 19,612 data sets for Rwanda. Here is a selection of some more data for Rwanda.

Electricity Daten

Data set Value
Electricity exports (kWh) 3,000,000
Electricity imports (kWh) 62,000,000
Access to electricity (% of population) 29.4
selected data set
Time required to get electricity (days)
34.0
Delay in obtaining an electrical connection (days) 31.4
Capacity of power plants, total (megawatt) 192
Capacity of power plants, public (megawatt) 192
Capacity of power plants, self-producer (megawatt) 1

General data

Data set Value
Population, total 12,501,156
Area (sq. km) 26,340.0
Gross domestic product in exchange rates (US $) 9,136,689,514
Gross domestic product per capita (US $) 748