Puerto Rico Puerto Rico: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Puerto Rico contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Puerto Rico

Puerto Rico is #170 in the world.

Compare Puerto Rico with another country

Puerto Rico Puerto Rico
A maximum of 4 countries can be selected!
Selected countries


More data for Puerto Rico

In our database there are 846 data sets for Puerto Rico. Here is a selection of some more data for Puerto Rico.

Electricity Daten

Data set Value
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 100.0
selected data set
Time required to get electricity (days)
32.0
Capacity of power plants, total (megawatt) 6,257
Capacity of power plants, public (megawatt) 6,196
Capacity of power plants, self-producer (megawatt) 61

General data

Data set Value
Population, total 3,659,007
Area (sq. km) 8,870.0
Gross domestic product in exchange rates (US $) 105,034,500,000
Gross domestic product per capita (US $) 30,833