Palau Palau: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Palau contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Palau

Palau is #31 in the world.

Compare Palau with another country

Palau Palau
A maximum of 4 countries can be selected!
Selected countries


More data for Palau

In our database there are 12,156 data sets for Palau. Here is a selection of some more data for Palau.

Electricity Daten

Data set Value
Access to electricity (% of population) 99.3
selected data set
Time required to get electricity (days)
125.0
Capacity of power plants, total (megawatt) 30
Capacity of power plants, public (megawatt) 28
Capacity of power plants, self-producer (megawatt) 2

General data

Data set Value
Population, total 21,964
Area (sq. km) 460.0
Gross domestic product in exchange rates (US $) 291,544,300
Gross domestic product per capita (US $) 13,417