The data set "Time required to get electricity (days)" for New Zealand contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for New Zealand

New Zealand is #132 in the world.

Compare New Zealand with another country

New Zealand New Zealand
A maximum of 4 countries can be selected!
Selected countries


More data for New Zealand

In our database there are 26,259 data sets for New Zealand. Here is a selection of some more data for New Zealand.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 9,026,000
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 100.0
Electricity production from oil, gas and coal sources (% of total) 19.8
Electric power transmission and distribution losses (% of output) 6.5
selected data set
Time required to get electricity (days)
58.0
Capacity of power plants, total (megawatt) 9,301
Capacity of power plants, public (megawatt) 9,008
Capacity of power plants, self-producer (megawatt) 293

General data

Data set Value
Population, total 4,749,598
Area (sq. km) 267,710.0
Gross domestic product in exchange rates (US $) 205,852,838,255
Gross domestic product per capita (US $) 42,941
We use Cookies, by using this website or closing the menu you accept the usage of cookies. OK