Mozambique Mozambique: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Mozambique contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Mozambique

Mozambique is #107 in the world.

Compare Mozambique with another country

Mozambique Mozambique
A maximum of 4 countries can be selected!
Selected countries


More data for Mozambique

In our database there are 20,912 data sets for Mozambique. Here is a selection of some more data for Mozambique.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 462,000
Electricity exports (kWh) 9,462,000,000
Electricity imports (kWh) 8,537,000,000
Access to electricity (% of population) 24.2
Electricity production from oil, gas and coal sources (% of total) 8.8
Electric power transmission and distribution losses (% of output) 14.7
selected data set
Time required to get electricity (days)
68.0
Delay in obtaining an electrical connection (days) 12.7
Capacity of power plants, total (megawatt) 2,491
Capacity of power plants, public (megawatt) 2,460
Capacity of power plants, self-producer (megawatt) 31

General data

Data set Value
Population, total 30,528,673
Area (sq. km) 799,380.0
Gross domestic product in exchange rates (US $) 12,333,859,926
Gross domestic product per capita (US $) 416