Mauritius Mauritius: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Mauritius contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Mauritius

Mauritius is #87 in the world.

Compare Mauritius with another country

Mauritius Mauritius
A maximum of 4 countries can be selected!
Selected countries


More data for Mauritius

In our database there are 24,224 data sets for Mauritius. Here is a selection of some more data for Mauritius.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 2,182,000
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 98.8
Electricity production from oil, gas and coal sources (% of total) 79.7
Electric power transmission and distribution losses (% of output) 6.2
selected data set
Time required to get electricity (days)
81.0
Delay in obtaining an electrical connection (days) 18.6
Capacity of power plants, total (megawatt) 838
Capacity of power plants, public (megawatt) 499
Capacity of power plants, self-producer (megawatt) 339

General data

Data set Value
Population, total 1,268,315
Area (sq. km) 2,040.0
Gross domestic product in exchange rates (US $) 13,338,147,523
Gross domestic product per capita (US $) 10,547