Lesotho Lesotho: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Lesotho contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Lesotho

Lesotho is #43 in the world.

Compare Lesotho with another country

Lesotho Lesotho
A maximum of 4 countries can be selected!
Selected countries


More data for Lesotho

In our database there are 16,610 data sets for Lesotho. Here is a selection of some more data for Lesotho.

Electricity Daten

Data set Value
Electricity exports (kWh) 0
Electricity imports (kWh) 247,000,000
Access to electricity (% of population) 29.7
selected data set
Time required to get electricity (days)
114.0
Delay in obtaining an electrical connection (days) 12.2
Capacity of power plants, total (megawatt) 80
Capacity of power plants, public (megawatt) 80

General data

Data set Value
Population, total 2,263,010
Area (sq. km) 30,360.0
Gross domestic product in exchange rates (US $) 2,639,386,291
Gross domestic product per capita (US $) 1,182