Lebanon Lebanon: Delay in obtaining an electrical connection (days)


The data set "Delay in obtaining an electrical connection (days)" for Lebanon contains data from the year 2009 until 2013.
Delay in obtaining an electrical connection is the average wait, in days, experienced to obtain an electrical connection from the day an establishment applies for it to the day it receives the service.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Lebanon

Lebanon is #18 in the world.

Compare Lebanon with another country

Lebanon Lebanon
A maximum of 4 countries can be selected!
Selected countries


More data for Lebanon

In our database there are 23,122 data sets for Lebanon. Here is a selection of some more data for Lebanon.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 2,892,000
Electricity exports (kWh) 0
Electricity imports (kWh) 1,245,000,000
Access to electricity (% of population) 100.0
Electricity production from oil, gas and coal sources (% of total) 98.9
Electric power transmission and distribution losses (% of output) 10.5
Time required to get electricity (days) 75.0
selected data set
Delay in obtaining an electrical connection (days)
56.0
Capacity of power plants, total (megawatt) 3,137
Capacity of power plants, public (megawatt) 2,237
Capacity of power plants, self-producer (megawatt) 900

General data

Data set Value
Population, total 6,093,509
Area (sq. km) 10,450.0
Gross domestic product in exchange rates (US $) 51,844,487,742
Gross domestic product per capita (US $) 8,524