Israel Israel: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Israel contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Israel

Israel is #54 in the world.

Compare Israel with another country

Israel Israel
A maximum of 4 countries can be selected!
Selected countries


More data for Israel

In our database there are 23,504 data sets for Israel. Here is a selection of some more data for Israel.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 6,600,000
Electricity exports (kWh) 4,224,000,000
Electricity imports (kWh) 0
Access to electricity (% of population) 100.0
Electricity production from oil, gas and coal sources (% of total) 97.8
Electric power transmission and distribution losses (% of output) 2.9
selected data set
Time required to get electricity (days)
102.0
Delay in obtaining an electrical connection (days) 55.3
Capacity of power plants, total (megawatt) 17,585
Capacity of power plants, public (megawatt) 16,198
Capacity of power plants, self-producer (megawatt) 1,387

General data

Data set Value
Population, total 8,452,841
Area (sq. km) 22,070.0
Gross domestic product in exchange rates (US $) 350,850,537,827
Gross domestic product per capita (US $) 40,270