Indonesia Indonesia: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Indonesia contains data from the year 2013 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Indonesia

Indonesia is #167 in the world.

Compare Indonesia with another country

Indonesia Indonesia
A maximum of 4 countries can be selected!
Selected countries


More data for Indonesia

In our database there are 26,097 data sets for Indonesia. Here is a selection of some more data for Indonesia.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 811,000
Electricity exports (kWh) 0
Electricity imports (kWh) 2,542,000,000
Access to electricity (% of population) 97.6
Electricity production from oil, gas and coal sources (% of total) 88.6
Electric power transmission and distribution losses (% of output) 9.4
selected data set
Time required to get electricity (days)
34.0
Delay in obtaining an electrical connection (days) 6.0
Capacity of power plants, total (megawatt) 59,033
Capacity of power plants, public (megawatt) 39,980
Capacity of power plants, self-producer (megawatt) 19,053

General data

Data set Value
Population, total 266,794,980
Area (sq. km) 1,910,931.0
Gross domestic product in exchange rates (US $) 1,015,539,017,537
Gross domestic product per capita (US $) 3,847