Ghana Ghana: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Ghana contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Ghana

Ghana is #91 in the world.

Compare Ghana with another country

Ghana Ghana
A maximum of 4 countries can be selected!
Selected countries


More data for Ghana

In our database there are 22,511 data sets for Ghana. Here is a selection of some more data for Ghana.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 354,000
Electricity exports (kWh) 1,036,000,000
Electricity imports (kWh) 106,000,000
Access to electricity (% of population) 79.3
Electricity production from oil, gas and coal sources (% of total) 35.3
Electric power transmission and distribution losses (% of output) 22.6
selected data set
Time required to get electricity (days)
78.0
Delay in obtaining an electrical connection (days) 44.7
Capacity of power plants, total (megawatt) 4,399
Capacity of power plants, public (megawatt) 4,399
Capacity of power plants, self-producer (megawatt) 210

General data

Data set Value
Population, total 29,463,643
Area (sq. km) 238,540.0
Gross domestic product in exchange rates (US $) 47,330,016,343
Gross domestic product per capita (US $) 1,641
We use Cookies, by using this website or closing the menu you accept the usage of cookies. OK