Dominica Dominica: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Dominica contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Dominica

Dominica is #127 in the world.

Compare Dominica with another country

Dominica Dominica
A maximum of 4 countries can be selected!
Selected countries


More data for Dominica

In our database there are 14,738 data sets for Dominica. Here is a selection of some more data for Dominica.

Electricity Daten

Data set Value
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 100.0
selected data set
Time required to get electricity (days)
61.0
Delay in obtaining an electrical connection (days) 5.6
Capacity of power plants, total (megawatt) 41
Capacity of power plants, public (megawatt) 27
Capacity of power plants, self-producer (megawatt) 14

General data

Data set Value
Population, total 74,308
Area (sq. km) 750.0
Gross domestic product in exchange rates (US $) 562,540,741
Gross domestic product per capita (US $) 7,610