The data set "Time required to get electricity (days)" for Colombia contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Colombia

Colombia is #49 in the world.

Compare Colombia with another country

Colombia Colombia
A maximum of 4 countries can be selected!
Selected countries


More data for Colombia

In our database there are 25,816 data sets for Colombia. Here is a selection of some more data for Colombia.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 1,289,000
Electricity exports (kWh) 1,294,000,000
Electricity imports (kWh) 8,220,000,000
Access to electricity (% of population) 99.0
Electricity production from oil, gas and coal sources (% of total) 25.8
Electric power transmission and distribution losses (% of output) 10.7
selected data set
Time required to get electricity (days)
106.0
Delay in obtaining an electrical connection (days) 20.8
Capacity of power plants, total (megawatt) 16,837
Capacity of power plants, public (megawatt) 16,213
Capacity of power plants, self-producer (megawatt) 624

General data

Data set Value
Population, total 49,464,683
Area (sq. km) 1,141,749.0
Gross domestic product in exchange rates (US $) 309,191,382,833
Gross domestic product per capita (US $) 6,302