Central African Republic Central African Republic: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Central African Republic contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Central African Republic

Central African Republic is #57 in the world.

Compare Central African Republic with another country

Central African Republic Central African Republic
A maximum of 4 countries can be selected!
Selected countries


More data for Central African Republic

In our database there are 11,805 data sets for Central African Republic. Here is a selection of some more data for Central African Republic.

Electricity Daten

Data set Value
Electricity exports (kWh) 0
Electricity imports (kWh) 0
Access to electricity (% of population) 14.0
selected data set
Time required to get electricity (days)
98.0
Delay in obtaining an electrical connection (days) 11.8
Capacity of power plants, total (megawatt) 44
Capacity of power plants, public (megawatt) 44

General data

Data set Value
Population, total 4,737,423
Area (sq. km) 622,980.0
Gross domestic product in exchange rates (US $) 1,949,411,659
Gross domestic product per capita (US $) 418