Botswana Botswana: Delay in obtaining an electrical connection (days)


The data set "Delay in obtaining an electrical connection (days)" for Botswana contains data from the year 2006 until 2010.
Delay in obtaining an electrical connection is the average wait, in days, experienced to obtain an electrical connection from the day an establishment applies for it to the day it receives the service.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Botswana

Botswana is #36 in the world.

Compare Botswana with another country

Botswana Botswana
A maximum of 4 countries can be selected!
Selected countries


More data for Botswana

In our database there are 23,482 data sets for Botswana. Here is a selection of some more data for Botswana.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 1,748,000
Electricity exports (kWh) 0
Electricity imports (kWh) 2,985,000,000
Access to electricity (% of population) 60.7
Electricity production from oil, gas and coal sources (% of total) 100.0
Electric power transmission and distribution losses (% of output) 10.8
Time required to get electricity (days) 77.0
selected data set
Delay in obtaining an electrical connection (days)
39.2
Capacity of power plants, total (megawatt) 621
Capacity of power plants, public (megawatt) 601
Capacity of power plants, self-producer (megawatt) 20

General data

Data set Value
Population, total 2,333,201
Area (sq. km) 581,730.0
Gross domestic product in exchange rates (US $) 17,406,530,781
Gross domestic product per capita (US $) 7,596
We use Cookies, by using this website or closing the menu you accept the usage of cookies. OK