Algeria Algeria: Time required to get electricity (days)


The data set "Time required to get electricity (days)" for Algeria contains data from the year 2009 until 2017.
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Worldbank

Linechart

This section displays the historical data as line chart.

Country comparison for Algeria

Algeria is #12 in the world.

Compare Algeria with another country

Algeria Algeria
A maximum of 4 countries can be selected!
Selected countries


More data for Algeria

In our database there are 20,796 data sets for Algeria. Here is a selection of some more data for Algeria.

Electricity Daten

Data set Value
Electricity consumption per capita (kWh) 1,356,000
Electricity exports (kWh) 803,000,000
Electricity imports (kWh) 736,000,000
Access to electricity (% of population) 99.4
Electricity production from oil, gas and coal sources (% of total) 99.6
Electric power transmission and distribution losses (% of output) 17.1
selected data set
Time required to get electricity (days)
180.0
Delay in obtaining an electrical connection (days) 49.1
Capacity of power plants, total (megawatt) 19,006
Capacity of power plants, public (megawatt) 14,692
Capacity of power plants, self-producer (megawatt) 4,314

General data

Data set Value
Population, total 42,008,054
Area (sq. km) 2,381,740.0
Gross domestic product in exchange rates (US $) 170,370,810,918
Gross domestic product per capita (US $) 4,123